The Carmel River News Blog gathers any and all data concerning Carmel River, CA from any and all sources. No claims to veracity are made. All pictures and quotes are owned by their source websites. This site only scratches the surface of the ancient history of Carmel Valley.
Friday, October 2, 2015
Carmel Valley Hills Restoration Project
In 1984, restoration of eight miles of river was scheduled to be completed by MPWMD within ten years. In 1992 and 1993, the restoration of the Valley Hills reach was completed and has since been irrigated.
After re-contouring of the site and the planting of cottonwoods, willows, alders, and dogwoods, a total of 4.10 acres of riparian vegetation exist, showing a 185% increase in riparian vegetation in this reach.
From: http://www.mpwmd.dst.ca.us/MapGallery/Valley%20Hills%20copy.jpg
Picture from: robin purcell
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment